Our company, Moravia Systems, supplies the pipe storage for this project. The storage consists of fixed and spring hinges, supports and fixed points.
This is a project for the replacement of high-pressure steam collection pipes in the Mělník Power Plant, where the high-pressure steam pipes connecting individual boilers and turbines are gradually changed in stages. These are pipes with diameters of DN250 to DN350 and a temperature of 535°C, the pipe material is 15128. The previous two stages took place in previous years.
The storage delivery is intended for Strojírny a stavby Třinec, a.s.Operator of the Mělník Power Plant: Energotrans, a.s.